Construction Update: August 1, 2013-August 13, 2013

Posted by Kay Bowman

Henley Construction reports that they have:

  • Continued Casework/Millwork Installation
  • Began flooring installation (rubber flooring at 1st floor)
  • Above ceiling inspections, all areas
  • Continued toilet fixtures, 1st/2nd floors
  • Continued toilet partition and accessories
  • Inspected elevator
  • Continued ROW installation, curb and gutter, all areas
  • Installed pervious pavement (following inspection report)
  • Installed site concrete
  • Started seed/sod
  • Continued landscaping
  • Installed pylon sign
  • Started trellis wall installation
  • Installed asphalt paths